Hangar 400 has been continually filled with enthusiasm while working on the RV. The faring on the vertical stabilizer has been installed. The “tail feathers” have been sanded. The vertical stabilizer and the elevators have been attached to the rudder. The amount of tension needed to the wires for the elevator cables needed to be researched. The seat ramp cover was removed to tension the rudder. Trouble shooting was needed to fix a problem with the radio. The correct safety clips for the tension cables were ordered. Measurements were taken of the Adell clamp to adhere wire to the tail.